
Hi! I’m Alex.
I’m a mechanical engineering student at Boston University with a focus in structures and spaceflight hardware. I co-lead BURPG’s separation and recovery work and lead its aerodynamic downcomer fairing development, alongside my professional experience in research fixtures, manufacturing, and vacuum systems.
Boston University Rocket Propulsion Group
Flight Hardware
Argo Bipropellant Flight Vehicle
Separation and Recovery Subsystem
Sized recovery lines for a 1,230 lbf snatch load; the earlier black-powder configuration was 18.7 lbm within a 20 lbm allocation. Led the second integrated test.
Recovery Systems · Load Analysis · Testing
View projectCO₂ Deployment Mechanism
Designed and machined CO₂ piercers with a three-person team; completed a reduced-pressure component firing. Integrated testing is pending.
Fusion 360 · Stress Analysis · Machining · Testing
View projectAerodynamic Downcomer Fairing
Led three fairing concepts, aerodynamic/thermal screening, and the CoDR; the Icarus baseline/backup-candidate simulation in Ansys CFD is converged and under review.
Ansys CFD converged and under review · Supersonic Trades · Planned Adjoint Optimization
View projectGround Systems & Testing
Vacuum Test Chamber
Designed the installed 6061-T6 door, tube adapter, and seal for a 352 L chamber; operated it at 0.011 atm.
Vacuum Systems · Plate Analysis · Seal Design · Test Operations
View projectHybrid Rocket Nozzle
Reduced nozzle mass 73% from my initial design; the printed nozzle survived an approximately two-second hotfire.
SolidWorks · Nozzle Design · Hotfire Testing
View projectPictures/VEGAS/Assembly.png Design work complete; not assembled VEGAS Fire Suppression Planned mounting, fabrication, and pipe routing for a CO₂ fire-suppression system. SolidWorks · Mounting Design · Pipe Routing Show detailsHide details
February–May 2025 · BURPG
Developed assembly and mounting designs in SolidWorks for an existing suppression-system concept, including 3D-printed adapters, mounting hardware, and sheet-metal fixtures for the VEGAS stand.
- Planned fabrication and pipe routing with pipe-bending guidance.
- Worked from previously established component selections and assembly sequence.
- The 0.23 kg/s design flow, 1,070 PSI pressure value, and spreadsheet yield factor of safety of 4 were inherited design inputs.
- The system was never assembled; the club redirected available funds and parts to the flight vehicle.
Professional Experience & Research
BU Plummer Laboratory
Mechanical Design Assistant · June 2026–Present
- Designed and executed 48 Instron tests across four bistable physical Ising models, producing the lab's first direct force dataset for future empirical coupling analysis.
- CNC-machined a shaker adapter held to ±0.005 in; reduced estimated plate-and-bolt cost from $1,170 outsourced to $71.11 in-house.
- Built modular camera and hydrogel-test apparatus for ongoing research.
Culturon
Mechanical Engineering Intern · February–June 2026
- Designed adhesive-free sample racks in Onshape and ran full-scale nanoparticle deposition mapping.
- Used SEM/ImageJ and optical microscopy to characterize deposition patterns and present contamination-prevention concepts to technical leads.
- Experimental work and component-level design; public details limited by NDA.
Ablative Pulsed Plasma Thruster
Volunteer · University of Sydney · Sydney, Australia · May–June 2026
Designed an ABS inductor spool, performed coil-winding calculations, checked outgassing suitability, and provided limited support using the established operating procedure.
BU Space Physics & Technology Lab (SPTL)
Research Experience · October–December 2025
Analyzed COSSMo instrument data with Python and pySPEDAS; assisted with flight-spare laser calibration and observed the CDF data-product workflow.
Additional Projects
Wing Structural Lead (AIAA)
Built a complete Prototype 1 wing 42.7% lighter than the previous wing; cut build time from three months to one. Prototype 2 remained proposed.
Fusion 360 · Wing Structures · Manufacturing
View projectLine-Following Autonomous Vehicle
Led the vehicle design, build, programming, and testing; carried 250 g through six 12 ft runs in 70–86 seconds against a 90-second limit.
Arduino · Motor Control · Testing
View projectManufacturing & Machining
Manual and CNC machining, composite layups, and fixtures for research and flight hardware.
CNC Milling · Manual Machining · Composites
View projectME 360: Electromechanical Design
Linear stage and CNC box drawing, followed by a joystick-controlled 2.5 DOF fishing game.
CAD · Arduino · Motion Control
View project